Project Description

  1. Where the difference in level between the house and garage permits, insulation is laid onto the existing floor, a Damp proof membrane is installed – linking in with external cavity trays.
  2. In this example (our preferred method) the floor is then overlaid with a fibre reinforced cement screed. Alternate timber methods are available, but as most ground floors are concrete it is our opinion that the new floor should “feel” the same underfoot from one room to the next– a screeded floor is not susceptible to squeeks or creeks.